CONSTRUCTION OF ONSHORE COAL UNLOADING CRANE AT NEW MANGALORE PORT TRUST
The Client
Lanco Infratech Ltd is one of India's top business conglomerates and among the fastest growing. The company has executed many challenging infrastructure projects across India, including Highways.
The Business Need
Construction of onshore coal unloading crane, with a capacity of 30t at single bucket, for unloading coal from vessel at New Mangalore Port Trust (NMPT).
Key Challenge
An accident had occurred here previously due to improper operation and co-ordination.
Solution:
Allcargo Logistics Ltd. provided an expert logistic solution using innovative methods and advanced technology. A detailed study was conducted in
-
Load distribution calculation according to crane capacity
-
Movement distribution according to separate crane & capacity
-
Fixing the ground condition according to cranes
-
Movement distribution in ratio of 40 % & 60%
-
Wind speed measurement
And based on the study, a combination of these two cranes was suggested:
-
LEIBHERR 1400 – 400t
-
KOBELCO 2500t
Implementation:
A combination of two cranes were pressed into service and the total length of job was divided into two parts.
-
Total wt according to the ratio of 60% & 40%
-
Total wt – 85 t
-
Total length of the job– 28 m
-
LR Working range – 18 m
-
Boom length – 63 m
-
Load – 54 t
-
CKE working range - 15 m
-
Boom length – 70 m
-
Load- 34 t
Among the safety measures taken up at NMPT, Mangalore were
-
Engineering Control and Applications
-
Monitoring the Safety of Equipment
-
Controlling emergency situations in sensitive places near the job site.
-
Medical Vigilance
-
Documentation of Defective Equipment
-
Prevention of injuries and hazardous situations
-
Use of Personal Protective Equipment
-
Curbing loss-inducing circumstances through proper analysis of safety requirements of an industry.